Apartment | Resale in Nueva Andalucía
€579,000
Status:Sale On Hold
Nueva Andalucía, Costa del Sol
Listed at:April 14, 2025
Last update:June 17, 2025
3 beds
2 baths
99 sqm interior
15 sqm terrace
Overview
Fantastic opportunity to own a fully renovated corner apartment in the sought-after La Maestranza urbanization, just minutes from Puerto Banús, Centro Plaza, and Aloha. This gated community offers 24-hour security, beautifully maintained gardens, and multiple swimming pools.
The 99 m² apartment with a 15 m² terrace features three spacious bedrooms, including a master suite with an en-suite bathroom, and two modern bathrooms with underfloor heating, elevator and large walk-in showers. The open-plan layout creates a bright and airy living space, complemented by modern double-glazed windows, new electrical systems, and a high-end Danish KVIK kitchen with a wine cooler and top-quality appliances.
For ultimate comfort, the apartment includes a new integrated air conditioning system with individual room controls via WiFi, ample storage, and a private underground parking space.
With easy street-level access, proximity to pools and gardens, and a tourist license in place, this fully furnished apartment is perfect for both personal use and rental investment.
The 99 m² apartment with a 15 m² terrace features three spacious bedrooms, including a master suite with an en-suite bathroom, and two modern bathrooms with underfloor heating, elevator and large walk-in showers. The open-plan layout creates a bright and airy living space, complemented by modern double-glazed windows, new electrical systems, and a high-end Danish KVIK kitchen with a wine cooler and top-quality appliances.
For ultimate comfort, the apartment includes a new integrated air conditioning system with individual room controls via WiFi, ample storage, and a private underground parking space.
With easy street-level access, proximity to pools and gardens, and a tourist license in place, this fully furnished apartment is perfect for both personal use and rental investment.
Building Details
Completion DateJanuary 1970





